Wastewater treatment

Rhosesmor WwTW

Integration of post-HST CSAF, new pumping and deep-bed filtration within a live site with difficult terrain and access.

General arrangement drawing for the Rhosesmor wastewater treatment works upgrade
LocationWales
SchemeLive brownfield upgrade
SectorWastewater treatment

Project summary

A live treatment works.
A carefully integrated upgrade.

The Rhosesmor brownfield upgrade combines post-HST CSAF, new pumping and gravity deep-bed filtration. Design integration addresses steep gradients, overhead electrical constraints, erosion and subsidence, while keeping the existing site operable.

Scheme features

  • Wet well and duty/standby feed pumps
  • Interconnecting and backwash pipework
  • MCC integration and access
  • Brownfield interfaces, terrain and live-site operability

Scheme information is shown where applicable; the detailed FEBUS scope varies by commission.

All selected projects

Contact FEBUS

Bring us the project.
We will bring the engineering.

Contact FEBUS